/BdwlkjNews.asp?id=1367 螺纹钢连铸连轧生产线 - 豪门会彩票,豪门会彩票app

设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

电 话:0379—60125771

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 30吨中频炉2020

    铜管光亮退火设备2020新型

    全自动圆钢中频炉2020新型

    铝管加热退火生产线2020新型

    铝材感应加热生产线2020新型

    钢管热处理生产线2020新型

    感应加热生产线2020新型

    铜管退火中频炉2020新型

    3吨中频炉2020新型

    1吨中频炉2020新型

    0.5T中频炉2020新型

    500kg定点浇铸中频炉

    1吨塞棒底注式中频电炉

    管端加厚生产线

    合金熔液搅拌电炉

    12吨中频感应熔炼炉

    茶壶5吨熔铝中频炉

    0.5吨逆变串联中频炉

    串联谐振2吨中频炉

    钢坯补温提温加热炉

    钢坯感应加热炉

    雾化定点浇铸炉

    智能控制1吨中频炉

    智能控制3吨中频炉

    智能控制5吨中频炉

    5吨一拖二中频炉2018

    1吨称重管理中频炉

    中频感应精炼炉

    工业电炉技术资料
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    螺纹钢连铸连轧生产线

    Rebar continuous casting and rolling production line

    原料:废钢

    Raw material:steel scrap

    1、采用45t中频炉将原料废钢融化成钢水,产量达到280t-300t/班。(中频炉规格1.02线圈,输入电压1000v;变压器3150v1000v

    2、融化好的钢水通过钢水包运送至连铸机中包车,然后对钢水进行浇注,通过振动机构、拉矫机、导向辊、调整辊、液压剪等生产出70mm-120mm方坯,连铸机拉速在1.5-2.5m/min(连铸机规格6m弧一机一流)

    3、拉好的钢坯通过输送辊道运送至430三辊开坯轧机前往返轧制7道次,(430轧机电机为交流800kw;轧机线速度3m/s

    4、轧件通过输送辊道运送至精轧机组8架进行连续轧制,轧制出合格的成品通过飞剪进行备尺上步进冷床,轧件经步进冷床冷却后成组进行定尺剪切,定尺好的轧件再通过打包移钢进行人工打包入库。精轧K1线速度10-12m/s。(精轧机组300轧机6架、280轧机2架,电机分别为交流450kw一台,交流400kw一台,直流500kw一台,直流630kw一台)

    5、成品φ12-φ18螺纹钢,φ10-φ18圆钢;轧钢生产线产能320t/

    Rebar continuous casting and rolling production line

    Raw material:steel scrap

    1. Using 4 sets of 5t intermediate frequency furnace to melt the raw material scrap into molten steel, the output reaches 280t-300t/shift. (Intermediate frequency furnace specification 1.02 coil, input voltage 1000v; transformer 3150v becomes 1000v)

    2. The molten steel is transported to the continuous casting machine by the ladle, and then the molten steel is poured. The 70mm-120mm billet is produced through the vibration mechanism, the tension leveler, the guide roller, the adjusting roller and the hydraulic shear. The machine pull speed is 1.5-2.5m/min (the continuous casting machine specifications 6m arc one machine first-class)

    3. The drawn steel billet is transported to the 430 three-roller billet rolling mill for 7 times by the conveying roller. (The 430 rolling mill motor is AC 800kw; the rolling mill linear speed is 3m/s)

    4. The rolled parts are transported to the finishing mill by the conveying roller to 8 consecutive rolling, and the qualified finished products are rolled out to pass the flying shears to the stepping cooling bed on the preparation scale. The rolled parts are cooled by the stepping cooling bed and then grouped. The cut piece is cut to length, and the rolled piece is fixed and packed into the warehouse by packing and moving steel. Finished K1 line speed 10-12m / s. (6 sets of finishing mill 300 rolling mills, 2 280 rolling mills, one motor is 450kw, one AC 400kw, one DC 500kw, one DC 630kw)

    5, finished φ12-φ18 rebar, φ10-φ18 round steel; rolling steel production capacity 320t/class

    http://www.firstfurnace.com//BdwlkjProduct.asp?id=430

    http://www.yxdianlu.com//BdwlkjProduct.asp?id=414


    Copyright© 2007-2013洛阳松导感应加热科技有限公司 All Rights Reserved 
    电 话:0379—60125771 手 机:15038554363
    网站正在制作中,随时修改,非正式运行。
    本站关键词:豪门会彩票,豪门会彩票app、熔炼炉