/BdwlkjNews.asp?id=1377 Technical parameters and configuration of 0.25 ton melting furnace - 豪门会彩票,豪门会彩票app

设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

电 话:0379—60125771

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 30吨中频炉2020

    铜管光亮退火设备2020新型

    全自动圆钢中频炉2020新型

    铝管加热退火生产线2020新型

    铝材感应加热生产线2020新型

    钢管热处理生产线2020新型

    感应加热生产线2020新型

    铜管退火中频炉2020新型

    3吨中频炉2020新型

    1吨中频炉2020新型

    0.5T中频炉2020新型

    500kg定点浇铸中频炉

    1吨塞棒底注式中频电炉

    管端加厚生产线

    合金熔液搅拌电炉

    12吨中频感应熔炼炉

    茶壶5吨熔铝中频炉

    0.5吨逆变串联中频炉

    串联谐振2吨中频炉

    钢坯补温提温加热炉

    钢坯感应加热炉

    雾化定点浇铸炉

    智能控制1吨中频炉

    智能控制3吨中频炉

    智能控制5吨中频炉

    5吨一拖二中频炉2018

    1吨称重管理中频炉

    中频感应精炼炉

    电炉行业动态新闻
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    Technical parameters and configuration of 0.25 ton melting furnace

    0.25 t smelting furnace power selected power range is generally selected 200-250KW; 1000Hz frequency range; depending on the tonnage, the different process requirements of the melting furnace proper power to achieve the best benefit ratio.

    1. 0.25 ton melting furnace configuration and quotation:

    Medium frequency melting furnace model GWT-0.5/250

    250KW medium frequency melting furnace   Configuration

    200KW   Medium frequency melting furnace   Configuration

    IF melting furnace Rated power

    250KW    KGPS IF power supply

    200KW    KGPS IF power supply

    Frequency melting furnace intake phase voltage

    3*380V

    3*380V

    Medium frequency melting furnace rated voltage

    1500V

    1500V

    IF melting furnace type rated capacity

    0.25T

    0.25T

    IF melting furnace Rated temperature

    1600 ° C

    1600 ° C

    With KGPS IF power supply specifications

    KGPS-0.5/250

    KGPS-0.5/200

    Medium frequency melting furnace configuration list:

    fast   KGPS IF power supply

    set

    Inverter compensation capacitor cabinet

    set

    Melting furnace body

    Two sets

    Melting furnace reducer

    Two sets

    Water cooled cable

    Two

    Decidua

    One

    Manual information

    One

     

    Second, the classic line 0.25 ton melting furnace configuration instructions: 
          A, intermediate frequency power supply and electrical parts: intermediate frequency power supply, compensation capacitors and control cabinets. 
          B. Furnace part: equipped with two aluminum shell furnaces, one for production and one for standby; the furnace body includes furnace shell, inductor, crucible, furnace bracket, reducer, water distributor and so on. 
          C. Connection material: one set of copper to the capacitor to the capacitor cabinet; one set of water-cooled cable (capacitor cabinet to the furnace) 
    Note: The above configuration is a standard configuration of the typical “one electric two furnaces” form. We can provide configuration solutions that meet the production requirements according to different production process requirements.

     