/BdwlkjNews.asp?id=1384 Melting furnace inspection steps before leaving the factory - 豪门会彩票,豪门会彩票app

设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

电 话:0379—60125771

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 1吨中频炉技术协议

    30吨中频炉2020

    铜管光亮退火设备2020新型

    全自动圆钢中频炉2020新型

    铝管加热退火生产线2020新型

    铝材感应加热生产线2020新型

    钢管热处理生产线2020新型

    感应加热生产线2020新型

    铜管退火中频炉2020新型

    3吨中频炉2020新型

    1吨中频炉2020新型

    0.5T中频炉2020新型

    500kg定点浇铸中频炉

    1吨塞棒底注式中频电炉

    管端加厚生产线

    合金熔液搅拌电炉

    12吨中频感应熔炼炉

    茶壶5吨熔铝中频炉

    0.5吨逆变串联中频炉

    串联谐振2吨中频炉

    钢坯补温提温加热炉

    钢坯感应加热炉

    雾化定点浇铸炉

    智能控制1吨中频炉

    智能控制3吨中频炉

    智能控制5吨中频炉

    5吨一拖二中频炉2018

    1吨称重管理中频炉

    电炉行业动态新闻
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    Melting furnace inspection steps before leaving the factory

     1. In order to verify the quality of the contract equipment and related equipment during the production period, the tenderee has the right to send the person to the factory where the winning bidder is located for inspection. For the transportation expenses at the location of the winning bidder and for the quality inspection requirements of the bidder, such as necessary safety equipment, office supplies, technical documents and drawings, accounting data, manufacturing and inspection standards and other necessary inspection data shall be free of charge by the winning bidder. provide.

    2. The written materials formed by all the supervisors and quality inspection activities of the tenderer during the manufacturing period shall not be used as the quality certification documents of the successful bidder. Before the delivery, the quality inspection of the tenderer shall not remove the responsibility of the contract within the scope of the supplier's quality guarantee period, nor shall it replace the quality inspection of the equipment at the tenderee's site.

    3 . In the mid-inspection, the issues discovered or raised by members of the quality inspection team shall be resolved through friendly consultations.

    4. The equipment must be tested in the overall joint test before leaving the factory. The time for the inspection of the tenderee shall be determined according to the trial operation time. The joint trial operation shall be carried out under the supervision of the inspector of the tenderee.

    5. If there is a problem in the assembly test after the equipment arrives at the bidder's site, the reason is that the winning bidder did not perform the overall joint commissioning of the equipment before leaving the factory, so the delay time will be calculated according to the delayed delivery date.